A safe construction site with lifts and scaffolding tailored to your needs

Whether it is a new-build project or a renovation, construction work often means working at height. Euro Rent offers a wide range of support equipment for safe vertical transport and working at height.
Euro Rent hires out and sells a wide range of lifts. “Our lifts safely transport your staff and materials up and down,” the company says. “We have the right lift installation for every type of project. With a choice of lift cages, lifting capacities, installation heights and travel speeds, you can easily select the best lift for your project. Have a unique project? That is no problem either. Our engineers will work with you to design and build a lift tailored to your project.”
Manhattan Center Brussels
The Manhattan Center on the Inner Ring Road, near Rogier, is undergoing extensive renovation. At 102 m, the Manhattan Center is one of Brussels’ tallest and most iconic buildings. A closed passenger lift from Euro Rent is being used to transport the more than 300 construction workers on site. With more than 1,500 trips a day, the lift is in constant use. It is equipped with a floor selector, allowing it to be sent to any floor from inside the lift. To ensure an efficient flow of passengers, with minimal waiting times and maximum capacity, a lift operator is on duty. The lift operator ensures the lift is always used correctly, meaning there is virtually no downtime.

Scaffolding specialist
Euro Rent has the largest range of scaffolding equipment in Belgium. “Our extensive range of professional Layher scaffolding equipment makes it quick and easy to assemble your scaffold. We supply scaffolding equipment in a variety of sizes and working heights, as well as concrete shoring, roof edge protection and stair towers. Whether your site is large or small, our expertise will help you create a safe construction site.”
On-site specialist
Customers can count on personal support from Euro Rent’s scaffolding product specialist for advice and guidance. “As every project has different requirements, our specialist will visit your site free of charge to assess the situation,” the company says. “This ensures you get the most efficient scaffold design, save on materials and build faster. If required, we can also help with structural calculations and technical drawings. We work with the engineers and design office at Layher België to ensure you can build safely and in compliance with technical requirements.
Bellewaerde Aquapark
There was a risk of a shortage of scaffolding equipment during the construction of Bellewaerde Aquapark. Euro Rent says: “For this project, 50% could be supplied by Layher and MSC. Euro Rent provided the solution for the other half. Using MSC’s bills of materials, we were able to quickly supply the required quantities of base plates, base jacks, standards, ledgers, diagonals and system decks. Euro Rent delivered more than 50 tonnes of equipment in total in just one week. The large order and the length of time the equipment was needed for the project also meant that attractive hire rates were available.

Successful test of the drop-head system
For the construction of an industrial building in Knokke, Bouwbedrijf Van Kerschaever used the Layher drop-head system for the first time to support two floors for predalles. When drop heads are used, the aluminium beams (bearers) can quickly be released for use on new bays or floors. The propping remains in place until the concrete has reached the required strength, while the beams can be released once the concrete is self-supporting.
Van Kerschaever: “We were put in touch with Euro Rent through Layher België. We needed a large amount of shoring equipment at very short notice. While Layher calculated the equipment required, Euro Rent’s specialist handled site visits, explanations and project follow-up. Once the first few metres had been installed, the rest was child’s play. Installation was even smoother than with traditional shoring systems. The main advantages? The drop-head system works with our own Layher Allround scaffolding equipment, and the equipment’s higher utilisation delivers significant time and cost savings. We already have the next project using the drop-head system scheduled.”